As winter winds down here in the Northeast, our team has worked hard to keep projects on track through some brutally cold weather. One aspect of the construction process that is complicated by lower temperatures is pouring concrete. Ideally, the air should be at least 40 degrees Fahrenheit, but when temperatures drop, there are a few different options for ensuring a successful concrete pour. Here are 8 tips from Project Superintendents Ray Ruggiano and Art Schumann:
5 Hanover Square, 19th Floor, New York, NY 10004 I Tel. 212-265-2191 I email: info@eastmancooke.com